Scarlet BESS
Cantua Creek, Fresno County
Battery storage connections
At Scarlet BESS, the connection between the batteries and substation ran through four bores of roughly 650 feet each—all drilled from within the substation.
The scope
Rosendin and EDP Renewables needed underground connections at Scarlet BESS in Cantua Creek, Fresno County. The scope was approximately 2,600 feet of 8-inch Boregard pipe, split across four bores.
The challenge
All four bores were drilled from inside the electrical substation. Our crew worked within the substation’s available space to install the connections.
The approach
Using an AT 60, the crew drilled four approximately 650-foot runs through clay and sand to connect the batteries to the substation.