Elite installed 24-inch HDPE casing beneath Highway 101, fusing the pipe in 250-foot sections to suit the site’s limited staging area.
The scope
Elite installed 24-inch HDPE casing beneath Highway 101 for PG&E and UECCo. The original plan called for 750 feet of pipe; the project record gives an approximate bore length of 550 feet. An AT 60 drilled the pilot, followed by an AT 100 for reaming.
The challenge
Limited staging space beside Highway 101 meant the crew couldn’t fuse and pull the full pipe string at once. The site also sat beside a waterway, which raised concerns about cobble. The bore passed through dirt rather than the anticipated cobble.
The approach
Our crew fused and de-beaded the pipe in 250-foot sections to suit the available staging space. Robotic Sewer Solutions handled the center fusion’s de-beading, and the casing required grout slurry.